Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

Getting Started with Apache OFBiz Manufacturing & MRP

Introduction

OFBiz Manufacturing & MRP is a highly functional seamless application that contains everything you need to run an efficient and successful manufacturing business.

...

By the end of the document, you should have enough information to begin your own manufacturing setup in OFBiz.

Target Audience

This document is written for the complete novice end user. No programming or technical experience is required.

What is Manufacturing?

Manufacturing is the “act of making something out of raw materials”. The 'something' that is manufactured is generally a product that can be on-sold to customers.

Manufacturing is not only an industrial activity carried out in a factory, but it can also be any range of tasks that result in an end product. So, even if you only assemble products you can still make use of OFBiz Manufacturing & MRP.

What is MRP?

MRP is a three-letter abbreviation that is always used in conjunction with manufacturing – so what exactly is it?

MRP stands for “Material Requirement Planning”. It’s a computer program that, when running regularly, helps a business to plan what to manufacture and when to manufacture it.

...

The MRP tool comes with OFBiz ‘out of the box’.

The 5 Steps to ‘Getting Started’

This guide assumes you have read and performed the tasks in the “Getting Started with Apache OFBiz In 5 Easy Steps” document and that you have already:

...

Log in using the username “admin” and password “ofbiz” to perform all OFBiz tasks.

Step 1: Understand Your Manufacturing Processes

  • This first step involves taking a look at your business processes and what your manufacturing flows are.
  • You need to be able to answer questions about when you manufacture your product,
    • what triggers the process
    • and how you manufacture.

Step 2: Decide which processes you want to use OFBiz for

If you are new to OFBiz you may want to look at starting with a simple process then when you’re more comfortable move onto your more complex processes.

Step 3: Setup your Product Data

Setup the product data you need; This will include your raw materials and your manufactured product.

Approximate Time Required to Complete: 15 minutes

Step 4: Setup your Manufacturing Data

Setup the data you need for manufacturing; This includes the Bill of Materials (BOM), Routing Tasks and a Routing.

Approximate Time Required to Complete: 15 minutes

Step 5: Run MRP

...

, Review the Results and Execute Procurement and Production Run

Run MRP and take a close look at the results.

Approximate Time Required to Complete: 20 minutes


Step 1: Understand Your Manufacturing Processes

Take a look at your business processes. You need to know what your manufacturing flows are. You should be able to define and describe the type of manufacturing you do.

...

Make sure to document all your responses and processes.

Step 2: Decide which processes you want to use OFBiz for

Decide on which manufacturing process (or processes) you'd like to use OFBiz for. Limiting your scope reduces your risk and makes it simpler to prototype and test.
If your initial process implementation is successful, then expand the prototyping to include additional processes.

Basic Manufacturing Concepts and Processes

There are generally the two main processes that trigger when you manufacture a product. They are as follows:

...

- This means that you’ll always have stock on hand in a warehouse or shop to sell to customers whenever an order arrives.

  • Make to Order (MTO)

- The manufacturing process is triggered by an order from a customer. 

- The product is manufactured specifically for that customer. There is no stock held in a warehouse or shop.


Your business may use either one or a combination of these processes. To support the above processes you also need to ensure that you have the right raw materials in stock at the right time to be able to manufacture.

  • This additional process is called “Raw Materials Purchasing”
  • Make to Stock, Make to Order and Raw Materials Purchasing are all supported with OFBiz2.


Example Scenario

Each manufacturing business will be different, so for demonstration purposes, we will use an example scenario.

...

We will setup this manufacturing business in OFBiz and configure MRP to prompt us when we need to make tables and when to order more raw materials.

Step 3: Setup your Product Data

Approximately 15 minutes is required to complete this step.

Using Catalog Manager to Set up the Raw Materials

  • Our first task is to set up our raw materials within OFBiz.
  • Use the Catalog Manager and the table below to:
  • Create new products of type “Raw Materials” for wood, nails, and varnish (see Figures 1, 2 and 3)

...

Product IDProduct NameMinimum StockRe-order quantity
10000*Wood25100
10010*Nails100500
10011*Varnish520
*Use Product ID returned by the Catalog Manager



Image Modified

                 Figure 1: Creating a New Product using the Catalog Manager             




Image Modified

Figure 2: Opening the entire form to enter details while creating a New Product 




Image Modified

                                                                       Figure 2.1: Review the entire form to enter Required details to create a New Product                                                                            

...

  • Make sure the “Requirement Method Enum Id” for each product is set to “When QOH Reaches Minimum Stock for Product Facility” as shown in Figure 2.
  • This tells MRP that when the Quantity on Hand (QOH) gets to our minimum then you want to order more.


Image Modified

Figure 2.3:  Setting the Requirement Method Enum Id

...

  • Set the re-order quantity and minimum stock fields using the product “Facilities” tab as shown in Figure 3.                                                                                                 
  • Select the Web Store Warehouse as the “Facility Id”



Image Modified

Figure 3: Setting Minimum Stock and Re-order Quantities for a Product

...

  • Suppliers for products are setup using the product “Suppliers” tab as shown in Figure 4.


Image Modified

Figure 4: Setting up a Supplier for a Product


Reminder: Before continuing, make sure you have created new products for Nails and Varnish too.



Using Catalog Manager to Set up the Manufactured Product

...

  • Make sure the “Requirement Enum Id” is set for this product too as shown in Figure 5.


Image Modified

Figure 5: Setting the Requirement Enum Id for the Manufactured Product

...

  • Enter a “Minimum Stock” but don’t set a re-order quantity for the table since we manufacture it and don’t need to order them from a supplier as shown in Figure 6.


Image Modified


Figure 6: Leave the Re-Order Quantity blank for the Manufactured Product


This step is now complete


Step 4: Setup your Manufacturing Data

            Approximately 15 minutes is required to complete this step.

...

  • Create a new Bill of Materials by pressing the ‘Create Bom’ in the Bill of Materials tab as shown in Figure 7.


Image Modified

Figure 7: Creating a Bill of Materials (BOM)

...

  • An example of how to enter the first product for a Bill of Materials is shown in Figure 8



Image Modified

FigFigure 8: Adding the first product to a Bill of Materials (BOM)

...

  • Once the first product (wood) is added a Bill of Materials (BOM) then additional products (nails, varnish) can be entered as shown in Figure 9


Image Modified

Figure 9: Adding an additional product to a Bill of Materials (BOM)

...

  • Once the items have been added to the Bill of Materials then you should see a screen similar to the one shown in Figure 10



Image Modified

Figure 10: All Raw Materials added to the Bill of Materials (BOM) for Table


Using Manufacturing Manager to Set up the Routing Tasks

            Next, we need to create Routing Tasks. These are the individual steps that are needed to turn the raw materials into a finished product.

...

  •  Create a new Routing Task by clicking the ‘New Routing Task’ button in the Routing Task tab as shown in Figure 11


Image Modified

Figure 11: Creating a new Routing Task

...

  • An example of how to enter a Routing Task is shown in Figure 12
    .

Image Modified

Figure 12: Entering Routing Task Details 


Using Manufacturing Manager to Set up the Routing

The final pieces of the manufacturing setup are to:

...

  • Create a new routing by clicking the ‘New Routing’ button in the Routing tab as shown in Figure 13.


Image Modified

Figure 13: Creating a New Routing

...

Routing NameDescription
Table RoutingRouting to Make Tables


Image Modified

Figure 14: Entering Routing Details

...

Tip: Use the “Add an existing Routing Task” to add the task and sequence to the routing

Image Modified

Figure 15: Adding a Routing Task Sequence to a Routing

...

  • Once all tasks have been added you should see a screen similar to Figure 16


Image Modified

Figure 16: All Routing Tasks and Sequences added to a Routing

...

  • Click on the “Edit Routing Product Link” tab and add the table product ID as shown in Figure 17 then click the “Update” button


Image Modified

Figure 17: Adding the Manufactured Product to a Routing


This step is now complete


Step 5: Run MRP

...

, Review the Results, and Execute Procurement, Production Run

Approximately 20 minutes is required to complete this step.


Next is the most exciting step – we’ll run MRP for the first time and see what it tells us.

Before we do that, let’s do a quick recap of what our setup instructs MRP to do:

  • When we make a table, use 5 pieces of wood, 20 nails and 1 bottle of varnish.
  • Maintain a minimum stock of 5 tables and when we reach that minimum stock level then prompt me to manufacture some more table
  • Maintain a minimum stock of 25 pieces of wood and when we reach that minimum stock level then prompt me to order 100 more pieces of wood.
  • Maintain a minimum stock of 100 nails and when we reach that minimum stock level then prompt me to order 500 more nails.
  • Maintain a minimum stock of 5 bottles of varnish and when we reach that minimum stock level then prompt me to order 20 more bottles.


Using Manufacturing Manager to Run MRP

Use Manufacturing Manager to:

  • Go to the “MRP” tab and run the MRP report (see Figure 18) with the following parameters:


MRP NameFacility GroupFacilityDefault Year Offset
MRP1leave blankWeb Store Warehouse1



Image Added

Figure 18: Enter Parameters to Run MRP



  • Click the “MRP Log” tab and determine if the program is pending or finished running. 
  • Initially, it goes to Pending status and when it is finished the report will appear with a “Status ID” of ‘Finished’ under the “Last Job” section of the screen.


Image Added

Figure 19: MRP Run Completed


  • View the MRP results by clicking the “Find” button.
  • On the result screen:
    • You will find the required actions taken to ensure the minimum QOH as per the "Requirement Method Enum Id" set on the product which we have set as "When QOH Reaches Minimum Stock For Product-Facility". 
    • Observe the Proposed "Purchase Order receipts" generated for Raw Materials as we need that much inventory in the facility based on minimum stock and reorder quantity configured for each.
    • Observe the "Proposed Manufacturing Order receipt" generated for the finished good(Table) that we have to manufacture.

Image Added


  • Now go to the Order Manager application "Requirements" Tab to find requirements generated through MRP for Raw Materials(Woods, Nails, and Varnish) and Finished Good.

Image Added


  • Go to the "Approve Requirements" tab, click find to review pending requirements, select the requirements you want to approve, and click Submit as shown below:

Image Added

  • You can also go to an individual requirement to review it in detail and mark it approved from there by updating the status of the requirement to Approved and submitting the form.

Image Added


  • Now go to tab "Find Approved Requirements By Supplier" and locate approved requirement.
  • Select "Bill To Customer Party ID" as your company, Select the "Facility ID" where the raw material supply is required and click "Prepare Order"

Image Added


  • On the next screen to enter a new Purchase Order, enter the PO ID click "Purchase Order Quick Entry" and finalize the order to the Supplier for these required raw materials.

Image Added


  • After finalizing the Purchase Order, complete the receiving process to get the Raw Materials in the facility for completing the Production Run for 5 tables.
  • Now locate the production Run generated when you approved the Proposed Requirement Manufacturing Order Receipt to manufacture 5 tables with the routing tasks that we have setup earlier. 
  • Go to the Manufacturing "JobShop" tab and find the production runs. 

Image Added


  • Open the production run by clicking the link. Review the details of required routing tasks and materials to execute the production run to manufacture 5 tables.

Image Added

  • Confirm or Schedule production run using the respective buttons on production run view.

Image Added


  • As you confirm the production run, you will see that the production run tasks based on the sequence will start showing the button with the label "Start" to start a task.

Image Added


  • As you start the task you will see a new button to Issue Components required to the task, click that button.

Image Added


  • Mark the task completed by clicking the Complete button.

Image Added


  • As you complete the first task, based on sequence the second task will be activated and ask to Start. Follow the same process to Start and complete remaining tasks in production run to complete it.

Image Added


  • As you complete all the tasks in the production run, it's going to be marked completed automatically, and the produced quantity of the product(Table) will be accessible. From here add produced goods to inventory and move it to a location in the facility.

Image Added


  • Now you can locate the produced product inventory in the system showing its ATP and QOH as 5 which is produced by executing complete the production run.

Image Added



If you have any questions on the process explained above, please feel free to send questions to the user mailing list<user@ofbiz.apache.org>.

If you face any issues while running the process feel free to open a Jira ticket and consider submitting a patch for the fix if you can. Thanks!