This page describes ability of test suites to execute stress tests.
- Name hyper-references the harness location.
- Exclude Lists are checked when per-platfrom exclude list is supported for the test suite.
- Time to Stop is checked when a system allows to specify a VM abort timeout.
- Time to Work is checked when a system allows to specify a time of repeated execution of the test.
- Crash Report is checked when a test crash is correctly reflected in the report and doesn't abort test execution.
- Numeric Report is checked when a numeric test result can be transformed into a report table. Using this report it should be easy to answer a question which of two applications under test is better.
- x is incomplete X.
Name |
Exclude Lists |
Time to Abort |
Time to Work |
Crash Report |
Numeric Report |
x |
X |
|
|
|
|
|
|
X |
|
x |
|
X |
X |
|
X |
|
|
x |
X |
|
X |
|
|
buildtest/branches/2.0/adaptors/HUT_iterative/HUT_iterative/ |
x |
X |
x |
X |
|
buildtest/branches/2.0/tests/stress/qa/src/test/stress/o/a/h/t/share/ |
x |
X |
X |
X |
|