Conference theme: Apache Linkis (incubating) biweekly regular meeting
Meeting time: 2022/11/23 19:30-21:00
Moderator: Xia Chen


Topic:
1.  [Fixed Topic] Apache Linkis Incubation & Version Progress Synchronization.


    Version 1.3.1 is in preparation. The boss directly hires Zhu Hui from PPMC to be responsible for the release
    Graduation progress incubator community discussion https://lists.apache.org/thread/vqxybqhjtvnokf9l74533rbk9dohto52
    Single test task collection https://github.com/apache/incubator-linkis/issues/2985
    ECP is responsible for managing the materials of EngineConn, as a management service, merged into LinkisManager https://github.com/apache/incubator-linkis/pull/3476
    Configure Key to support hot loading method to obtain https://github.com/apache/incubator-linkis/pull/3841
    Tenant IP address interception support https://github.com/apache/incubator-linkis/pull/3723
    Tenant label automatic matching support https://github.com/apache/incubator-linkis/pull/3723
    The data source supports MongoDB type https://github.com/apache/incubator-linkis/pull/3764

2. [Fixed topic] Apache Linkis 1.3.1 progress synchronization. ——Zhu Hui/Li Meng/Tao Zhiqiang

 trino engine documentation
 Engine Material Management Design Document 
 seatunnel environment deployment support
 seatunnel user documentation
 Basic data management known problem fixes 
 Basic data management usage documents & API interface 
 Data source enhancement Add self-test for oracle, kingbase, PostgreSQL, sqlserver, db2, greenplum, dm data support (mainly several metadata query interface verification interface has been provided) 
 Data source enhancement Add documentation for oracle, kingbase, postgresql, sqlserver, db2, greenplum, dm data support
 release-note preparation Ding Qi
 Authorization verification of the release process Brother Ding Qi followed up Prepare the environment according to the release-guide

3. [Fixed topic] Apache Linkis 1.3.2 demand planning. —— Xi Shihao/Li Meng
     1.3.2 Progress  
     Spark submit once merged into existing spark plugin testing, bug fixes in progress
     Spark has completed ETL through JSON, (the data source is configured through the URL to be adapted to the JDBC data source)
     UDF loaded according to id completed
     Linkis thrift protocol implementation development progress 20% Li Meng
     Engine parameter management, the first version has been developed, and further modification is needed. The interface development is completed, and the front-end joint debugging is to be completed. Unit testing Tao Zhiqiang/Qiao Mu

4. [Fixed topic] The progress of Apache Linkis community operation is synchronized. —— Li Wen

5. [Fixed topic] The host of the next regular meeting, welcome to claim. —— Xi Shihao
6. [Temporary topic] Synchronization of official website reconstruction progress
     LKIP-24 Linkis official website document reconstruction https://docs.qq.com/doc/DVUdVUHVxbEtXTUxa —— Jin Fu
    [Tencent document] Linkis official website reconstruction progress https://docs.qq.com/sheet/DY05tS3VqQXpFeVl5?tab=BB08J2
    Introduced Netlify to provide direct preview of pull requests for the official website Completed
    About collaboration roles Currently, some classmate permissions have been added, and some have been added

8. [Temporary topic] How to build a WeDataSphere knowledge base to facilitate community developers to find corresponding information Andy
9. [Temporary topic] DSS 1.1.1 release preparations
    Mainly bug fixes, scheduling dolphin bug fixes
    Import and export features of Dev Center workflow
    Optimization of publishing issues of dataapi data services

10 [Temporary topic] Subsequent planning and collection of major features and subsequent roadmap 


  • No labels